POWER 4 ALL to Build Modular Water Treatment Plant in El Nido

POWER 4 ALL, a leading provider of cutting-edge solutions for clean power and clean water, has been awarded the contract to design and build a modular water treatment plant by the Municipality of El Nido in Palawan.

The project is aimed at addressing the water supply shortage in El Nido, a popular tourist destination in Palawan, known for its beautiful landscapes and crystal-clear waters.

The new facility will tap into local freshwater source, particularly Bulalacao Falls, to provide up to 3 million liters per day of potable and reliable water supply for both local residents and the growing number of tourists within the municipality.  With its pioneering expertise in modular systems, POWER 4 ALL will utilize modern and efficient modular technologies to deliver consistent plant performance.   Additionally, the system’s small footprint. simplicity and reliability allow for easier maintenance and lower capital and operating costs.

This key project for El Nido will be fast tracked and completed in under 9 months.

By: Emman Codia, Business Dev't Supervisor

Share this Post:
SiteLock